UAS PROJECT DEVELOPMENT AND DELIVERY
UAS development, integration and production preparation.
Developing a drone or component? Let's discuss design, manufacturing, assembly and testing. After reviewing the project, we'll identify where SkyMav can help and where a partner is needed.
The first conversation does not require confidential information or technical documentation.

FOUR CAPABILITIES
Where we can support your project
We can support a selected stage of your project. The work below is a set of possibilities; we confirm delivery and partner involvement after reviewing the documentation.
Design for manufacturing
A review of the documentation and component list to identify what needs refining before manufacturing and assembly.
Component manufacturing
Preparing selected parts to the documentation, with an appropriate manufacturing process and supplier.
Assembly and integration
Combining agreed components and subsystems into a configuration ready for testing.
Testing and acceptance criteria
A test plan and recorded results to assess whether the agreed requirements have been met.
DELIVERY STAGES
From design to potential series production
Progression to each stage depends on documentation readiness, test results and a separate decision.
Design
Requirements, documentation, BOM and interfaces.
Manufacturing
Processes, materials and the agreed delivery model.
Assembly
Integration of agreed components and subsystems.
Testing
Checking the criteria under confirmed conditions.
Series production — subject to approval
A possible stage after the documentation, BOM, assembly process and acceptance criteria have been approved.
TECHNOLOGIES
Technologies selected for the project
The technologies below may form part of the agreed delivery model.
FDM
Parts and tooling, subject to confirmation of the material and requirements.

SLA
Parts selected according to geometry, material and intended use.

CNC
Machining components to agreed documentation and tolerances.

SMD/SMT
Electronics assembly may be included following a review of the design and delivery model.

OUTSOURCING AND LOCATION
Delivery scope defined before work starts
SkyMav develops and integrates UAV systems in Poland and works with specialist manufacturing partners on selected processes. We agree the scope of production, testing and acceptance documentation for each project.
Scope agreed for each project
After reviewing the materials, we allocate work between SkyMav, the client and specialist partners. We do not assume a single delivery model in advance.
Selected stages in Poland or the EU
We confirm the location of each operation, partner involvement and responsibilities for the specific delivery model. We do not use a general product-origin label.
HOW WE WORK TOGETHER
From first discussion to delivery
Below is one possible path for a project. We select the stages and suppliers needed, then agree the tasks and acceptance process before work begins. Progression depends on results and a separate decision.
01
Project discussion
Objective, stage and general context — no confidential information.
02
Confidentiality / NDA
We agree access rules before materials are shared.
03
Technical review
A list of gaps, risks and decisions needed for further work.
04
Prototype / first unit
A unit in the agreed configuration, prepared for assessment.
05
Assembly and testing
Test results assessed against the criteria agreed in advance.
06
Series production — subject to approval
A possible stage after the documentation, process and acceptance criteria have been approved.
07
Acceptance and delivery
Acceptance of the completed work and handover of the agreed documentation.
OPERATIONAL BENEFITS
A project guided by an agreed scope
Before starting, we define what will be produced, who is responsible and how we will assess the result. We select acceptance documents to match that work.
Clear allocation of tasks
It is clear which activities belong to SkyMav, the client and partners.
Work based on documentation
We base technical decisions on project materials and agreed criteria.
Review after each stage
After each stage, we review the results and decide whether to continue.
A safe first conversation
We start without CAD files, Gerbers, a BOM or other confidential information.



WHY WE WORK THIS WAY
Integration means considering the whole system
A structural change can affect the electronics, assembly and testing method. Before confirming the work, we check how the project's elements interact.
We check interfaces and risks
We check interface compatibility, component availability and gaps in the documentation.

We identify the work needed
We identify which elements need changes and who can carry them out.

We agree the acceptance process
We define what the test must confirm and which results will form the basis for acceptance.

CONFIDENTIALITY AND IP
Ground rules before sharing documentation
Before exchanging confidential technical documentation, we agree information-protection rules and, depending on the project scope, enter into an NDA. Access to project documentation is provided only to the extent necessary to carry out the agreed work.
First contact without documentation
To start, the project's objective, stage and general context are enough.
Information protection and NDA
We agree information-protection rules before exchanging materials and enter into an NDA depending on the project scope.
Controlled access scope
We share only the documentation needed to carry out the agreed work.
CONTACT
Let's discuss your UAS project.
A brief description of the project's stage and objective is enough to start.
SkyMav develops the SkyHover platform and works on UAS projects within a scope defined after a review.
© SkyMav · 2026
KRS 0001236707 · NIP 7963046809 · REGON 544552882
Małęczyńska 25, 26-600 Radom, Poland
